HomeProjectsStreetscapeAylesbury Transport Hub

Aylesbury Transport Hub

Description

Planting trees into made up ground or ‘fill’ material is extremely challenging. By its very nature, the requirements for heavy civil construction fill materials are completely opposed to the horticultural root zone requirements for trees.

The international engineering consultants advising on the project drew on GreenBlue Urban’s experience in the design and construction of structurally stable but root friendly tree pit designs to ensure that the trees had the best possible chance of success.

Continuous sub surface RootCell structures means that as the trees establish, they have access to a large volume of good quality soil for long term requirements. This soil structure is ventilated using GreenBlue Urban ArborVents and the services running parallel to the rooting corridor are protected by ReRoot 1000 root deflecting barrier.


GreenBlue Urband Ltd

71 Bysham Park Drive
Woodstock, ON N4T 1P1
Canada

4405 Anderson Road
Knoxville, TN 37918
United States

E: inquiries@greenblue.com
T: 1-866-282-2743

ENQUIRIES

Sign In/Registration

Join our newsletter

Subscribe to our newsletter to receive exclusive updates and free resources!

© 2020 GreenBlue Urban Limited. All Rights Reserved.